Built, running, and opening to selected users shortly. General availability is planned for January 2027.
The story
One job, from the first form to the finished file
A team set up in an afternoon, a project designed from a template with the help of AI, four surveyors collecting into one dataset, a form that changes in week two and reaches every phone the same afternoon, and a client who watches the work arrive. The easiest way to explain that is to walk a job through it.

The job
Fourteen thousand street lights, three weeks
Say your firm has won the lighting audit for a borough council. Every column in the area recorded: where it is, what type it is, how tall, what lamp is in it, what condition the door and the bracket are in, and anything nearby worth flagging. Four people on the ground, three weeks, and a dataset at the end that the council can load straight into their own system.
None of that is the difficult part. The difficult part is everything around it. Four surveyors in four different streets, each filling in what they believe the form is. Four sets of work that somebody has to turn into one at the end of every week. And a client who will change their mind about the form in week two, by which point four phones are already out there collecting against the old one.
An example rather than a case study: this is the shape of the work, not a named customer’s job.
The week before
The organisation and the team
You start on the web, not on a phone. You create your firm’s organisation and pay for it, and you are its admin. Then you invite the people the job needs, each by email and each with a role: a manager to run the job day to day, three surveyors as contributors, and the council’s lighting engineer as a viewer. Accepting the invitation is what creates each person’s account; nobody signs up for anything.
The roles do the rest. The manager can design and change projects and look after the crew. Contributors collect, with their own Mapit Pro or Pro+ on their phones. The council’s engineer needs no app and no licence at all: they see only what you choose to share with them, and nothing until you do.
Each surveyor can use the job on two phones or tablets and on one copy of QGIS, so a spare device in the van is not a problem and a borrowed one does not linger. The admin can do everything a manager does, so a small firm needs no manager at all.
Working alone? Not a problem
Everything in this story works for one person too. On the Personal plan you are the admin and the surveyor: design a project from a template or with the AI, collect on your own phone and tablet with everything in step between them, change the form mid-job, and send your client a web map or a live WFS instead of a file attached to an email. Your work is in the cloud and off a single phone, so a lost or broken device costs you nothing you had already synced. When the work grows, invite people and move to a team: the same organisation, with its projects, comes with you.
Monday morning
Designing the job
Your manager, or you as the admin, opens the Project designer and starts from the Street lighting inventory template in its catalogue. Or they describe the job to the AI designer in a sentence, say “street lighting inventory for a borough council, LED conversion planned”, answer the two or three questions it asks, and it proposes the layers and the fields: column type, height, lamp type, the condition of the door and the bracket, each with a pick list wherever the answer is one of a known set.
Nothing is decided for them. They read the proposal, change what does not fit the council’s specification, by asking again or by hand, and publish it. That is the moment it stops being a draft and becomes the version everybody works to, and your surveyors open Mapit GIS to find the job waiting, identical on every phone. Nobody has been emailed a file.
The AI sees the structure being designed and what you type to it, never the data your crews collect, and your organisation’s admin can switch it off for everybody. Underneath, releasing fixes the structure and gives it a number, which is what lets everybody’s work fit back together later.
Tuesday to Friday
Out on the ground
Your surveyor walks the street, drops a point at each column, works down the form and moves on. Two hundred columns in a day. The drop-downs mean the condition field says one of four things rather than four surveyors’ four spellings of the same word, which is most of what makes a dataset usable at the end.
Signal comes and goes across a borough, and it makes no difference to any of this: the map and the form are on the phone. It syncs when it can.

The part that used to hurt
One dataset, not four
This is the bit that usually costs a Friday. Four people have collected into four copies of the job, and somebody has to make one dataset out of them without losing anything or counting anything twice.
Here it has already happened. Each phone sends up what it collected and takes down what everybody else collected, so by Friday afternoon there is one dataset and it is the same one on every device. Nobody merges anything by hand. Nobody is working from a copy that is four days stale.
It is also why your surveyor sees the rest of the crew’s work on their own map. The streets already done are obvious, which is the cheapest way there is of stopping two people auditing the same road.
Only the changes travel, never the whole job, so a sync in week three costs the same as a sync on day one.
The awkward case
Two people, one lamp post
It happens. One surveyor records column 4412 on Tuesday and marks the door as damaged. Another passes it on Thursday, does not realise it is already done, and records the lamp type, which the first person had left blank.
Both pieces of work land. They filled in different parts of the same record, so the record ends up with both. Had they disagreed about the same field, one answer stands and the other is kept rather than thrown away. Your manager, or you, see both answers side by side on the portal, the two shapes on a map where they differ, and keeps one; the choice reaches every phone at its next sync. Nobody’s afternoon quietly disappears because somebody else got there first.
This is the promise the whole thing is built around. A sync is allowed to make a decision. It is never allowed to make work vanish.
Wednesday, week two
Changing the form mid-job
The council asks whether you can also record which feeder pillar each column is fed from. This is the phone call nobody wants. Four phones are out in the field with the old form on them, two thousand columns are already recorded, and on most jobs the honest answers are “from Monday” or “we will add it in the office afterwards”.
You or your manager open the project’s structure on the portal and tell the AI designer what the council asked for. It proposes a new field on the columns layer, they add it to their changes, look at what it changes, and release again. Adding it by hand takes a minute too. That is the whole job. The next time each phone syncs it picks up the new field and carries on with it, out in the street, that afternoon. The two thousand columns already recorded keep everything they had, and the new field sits empty until somebody fills it in. Nothing is re-issued, nothing is re-collected, and nobody has to be called in.
What you cannot do is rename or change the meaning of a field everybody is already using, and that is deliberate. Adding is safe. Quietly redefining something that has been collected for a week is how a dataset gets ruined, so the product refuses it and tells you to add a new field instead.
A release carries the change itself rather than a new copy of the job, which is why a phone can pick it up on a bus without noticing.
Any afternoon
One view of the whole job
Whoever runs the job has one place to look, and what they are looking at is the job itself rather than a summary of it. Not four files in an inbox, not a spreadsheet somebody stitched together on Thursday: the columns the crew have recorded, as they stand.
On top of that the portal shows the crew: who is working in which layer, how much each of them has collected, and when each phone last synced. Every figure carries the time it arrived, and a quiet row means a phone has not synced yet rather than somebody slacking. The board is careful never to imply otherwise.
Which is what you actually need when the client rings: how much of the borough is done, what has come back from where, and whether the answer is yes.
Week two onwards
The client, watching it arrive
The council does not have to wait for the end. You or your manager publish the columns layer as a WFS, only the fields the council needs, and builds a web map on it: the columns coloured by condition, a pop-up with each one’s details. Shared with the engineer, the map opens in their browser with nothing to install, and it shows what the crew has synced, as it arrives.
Their GIS team adds the same WFS to QGIS or ArcGIS Online with one address, read only, and their own maps update as the audit goes on. Photographs stay on the phones that took them; what the council sees is the data, and only the part you published.
A WFS or a web map is a copy of what you chose to publish, rebuilt as the crew syncs. The project itself is never opened to the people reading it.
The end of the job
The handover
The audit finishes. You close the job, which stops it taking any more work, and download it as a single file. It is a GeoPackage: an open format that QGIS, ArcGIS and most other serious tools open directly, with the layers, the fields and the drop-down lists intact. One file, not four, and not something only our software can read.
You hand that over, keep your own copy, and delete the job from the cloud when you are ready. Nothing vanishes from anybody’s phone behind their back: their copy simply becomes theirs.

QGIS on the desktop
Most of this work ends up in QGIS eventually, so Mapit GIS Cloud has a plugin for it: open a cloud project straight from the cloud on your desktop as a copy to view, and bring in the crew’s latest work whenever you want it, with no exporting and re-importing in between. It is read only: the work itself is done on the phones.
Because somebody will ask
Keeping it safe
The council’s data is the council’s before it is ours. A job is encrypted whenever it is not actually being worked on, under a key belonging to your organisation and nobody else, and everything stays in the EU.
Nothing is visible to anybody but you and your admin until you share it, which matters when the same firm is auditing lighting for one council and surveying trees for another. And one thing we will not pretend: our own staff with production access can reach organisation data, as they can on any platform that merges your records or serves you a map. What we owe you instead is a record of who looked, so every staff view of an organisation is logged.
Honestly
Where it is today
We are finalising deployments and starting testing. Mapit GIS Cloud will open to a small number of selected users shortly, and if you have told us you are interested you will be among the first asked.
General availability is planned for January 2027.